How we do it
- Install a temporary well point with our geo-probe (direct-push) equipment in the area of concern
- Collect the groundwater sample and send it to a certified lab for the analyses the NJDEP requires
- Compare the results to the NJDEP groundwater quality standards
- Document the well, the sampling and the results in the Remedial Action Report
Why a temporary well point
It's a faster, lower-cost way to sample groundwater at a residential tank site than a permanent monitoring well, and it is removed once sampling is done.
Frequently asked questions
Do I need soil sampling when my oil tank is removed?
In New Jersey, a tank closure should be documented with soil sampling by a certified professional. That sampling is what shows whether the tank leaked and what the report and UHOT filing are based on.
What's the difference between an SIR and an RAR?
An SIR is for a tank site where sampling found no contamination above NJDEP standards. An RAR is for a site where contaminated soil was found and removed.
What if my tank leaked?
We oversee removal of the contaminated soil, collect confirmation samples, and check groundwater if needed, then document it all in a Remedial Action Report.
How long does the report take?
Reports are completed within 24 hours of receiving the lab results (5 business days from day of soil sampling).
Do you work directly with homeowners or only contractors?
Both. We work with homeowners, buyers and sellers, real estate agents, property managers and tank removal contractors.
Service area
Based in Milford, Hunterdon County, Ace Environmental Services serves homeowners, property managers, real estate professionals and contractors throughout all of New Jersey.
Have a tank job that needs groundwater work?
Call (973) 333-3090, text (908) 505-5761, or email info@ace-environmentalservices.com.