NJDEP Certified: UST Closure & Subsurface Evaluation, UHOT Certified (973) 333-3090  ·  Text (908) 505-5761
Ace Environmental Services LLCEnvironmental Contracting & Consulting
UST removal oversight

Oil Tank Removal Oversight and Soil Sampling in New Jersey

When an underground oil tank comes out of the ground in New Jersey, the soil around it has to be checked and documented correctly.

Ace Environmental Services provides the NJDEP-certified subsurface evaluator who oversees the removal, inspects the excavation, and collects the soil samples that decide whether your site is clean or needs remediation. We've done this work across New Jersey since 2006, for homeowners, property managers and tank removal contractors.

What we do on site

  • Oversee the tank removal and inspect the tank and excavation for holes or staining
  • Field-screen the soil and document conditions with photos and a site sketch
  • Collect soil samples from the excavation and send them to a certified lab
  • Oversee removal of contaminated soil when it is found, and collect the post-excavation samples
  • Track contaminated soil to a licensed disposal facility, with scale tickets and manifests

Why it matters

The sampling done on removal day is what the final report and the UHOT filing are built on. Getting it right the first time avoids return trips, extra lab costs and delays at closing.

Why Ace

  • NJDEP certified for UST closure and subsurface evaluation
  • UHOT certified, OSHA trained, licensed and insured
  • Fieldwork, lab coordination and reporting all handled in-house
  • Reports completed within 24 hours of receiving the lab results
  • Serving New Jersey since 2006

Frequently asked questions

Do I need soil sampling when my oil tank is removed?

In New Jersey, a tank closure should be documented with soil sampling by a certified professional. That sampling is what shows whether the tank leaked and what the report and UHOT filing are based on.

What's the difference between an SIR and an RAR?

An SIR is for a tank site where sampling found no contamination above NJDEP standards. An RAR is for a site where contaminated soil was found and removed.

What if my tank leaked?

We oversee removal of the contaminated soil, collect confirmation samples, and check groundwater if needed, then document it all in a Remedial Action Report.

How long does the report take?

Reports are completed within 24 hours of receiving the lab results (5 business days from day of soil sampling).

Do you work directly with homeowners or only contractors?

Both. We work with homeowners, buyers and sellers, real estate agents, property managers and tank removal contractors.

Service area

Based in Milford, Hunterdon County, Ace Environmental Services serves homeowners, property managers, real estate professionals and contractors throughout all of New Jersey.

Schedule a removal or get a quote

Call (973) 333-3090, text (908) 505-5761, or email info@ace-environmentalservices.com.